Production Schedule
| |
Date, time and location of filming.
|
30th of November 2016
12:25 - 14:05 pm
Office/ empty classroom in Landau Forte Academy Tamworth Sixth Form
|
Actors
| Costume= Business suit. Reece Humphreys Costume= Business suit. _______________ |
Filming plan
|
|
Equipment
|
|
Props
|
|
Risk Assessment
|
Risk: Tripping.
Probability: Medium.
Prevention: Wear sensible footwear when filming and clear the filming area from furniture and objects that aren't required for filming purposes.
|
Risk: Being cut on sharp edges.
Probability: Low.
Prevention: Inspect equipment for sharp edges before handling and ensure that none of the props are damaged so that they pose a danger to the actors handling them.
| |
Risk: Electric shock.
Probability: Low.
Prevention: Keep electrical equipment dry and do not handle directly if they come into contact with water, unless they have a secure watertight casing.
| |
Risk: The disturbance of filming by bystanders and members of the public
Probability: High
Prevention: Ensure that filming occurs when the building is relatively empty e.g. when few students are on a break in the corridors surrounding the site of filming.
| |
Sunday, 27 November 2016
Task 9: Filming: Production Schedule (Updated)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment